Organisation: China
Academy of Engineering Physics
Institute of Nuclear Physics and Chemistry
Installation:
CMRR under construction
Type:
pool reactor 20 MW, Øth = 3.4·1014 n/cm²s,
Address:
P.O. Box 919-211 Mianyang, Sichuan, 621900, P.R. China
Home
page:
http://www.caep.ac.cn/
???
Contact:
Prof. Zhao Peng Ji
Phone
/ fax:
+86-816-2493842
fax: +86-816-2281598
e-mail:
zhaozhen@my-publie.s.c.cninfo.net
(general e-mail: npc@caep.ac.cn)
Co-workers:
Prof. Dai Jun-long, Eng. Hu
Chun-ming (chunming@caep.ac.cn),
Prof. Shen Wen-de (phone: +86-816-2485272)
CNS:
one, operation planned for 2007
moderator:
H2
phase:
liquid (subcooled)
volume:
~1 L
temperature:
18 K
pressure:
250 kPa
heat removal:
thermal siphon (vertical)
material:
chamber: Al alloy vacuum thimble:
Al alloy
power:
1500 W refrigerator:
??
----------------------------------------------------------------------------------------------------
remarks:
reactor behavior in case of CNS refrigeration failure:
The reactor can continue operation with CNS emergency cooling at room
temperature.
recent
publications:
"COLD NEUTRON SOURCE AT CMRR" by Hu
Chunming, & al.
(CMRR), and V. Kouzminov, & al. (PNPI) in Proc.
IGORR9 2003
V. Mityukhlyaev in Proc.
UCN-CNS 4th Workshop
(PNPI 2003)